With a significant economic boost for downtown Bangor in the balance, WBRC Architects•Engineers was asked to shepherd this $130-million project through the state and local permitting processes as quickly as possible, as well as provide civil, site, structural, and landscape design, as well as local architectural consultation.
Maine Department of Environmental Protection approvals for the hotel and casino were granted in less than three months, and designs allowed for fast-track construction, with one floor of the seven-level hotel being completed each week.